Telephone Number

Our Contact Details

Eco-Futures
The Studio, Estate Office, Glanusk
Crickhowell
NP8 1LP
01873 811909

Paul Short

The future of the Code for Sustainable Homes

In January we published details of the Welsh Assembly Government consultation on changes to Part L (Conservation of fuel and power). We are now very close to from finding out what the future could hold for the Code for Sustainable Homes (CSH) in England.

There are rumours that the requirement for CSH could be reduced, or even phased out completely over the coming years. Consultation papers are expected to be released in England during May, with the Government scheduled to publish a ‘plan of action’ by the end of July.

It’s part of a much wider-reaching Government initiative known as The Red Tape Challenge. Since 2010 all kinds of bureaucracy from equality to health and safety have been scrutinised to look at how things can be made simpler for everyone.

Part of this Red Tape Challenge includes the Housing Standards Review (HSR), which has been investigating ways of cutting some of the complexities which we currently find in the construction industry. The Code for Sustainable Homes is one such area which has been put under review.

It’s hoped the findings of the HSR will uncover ways of making CSH more viable for developers, to save time and money… but at an extreme level, it could be announced that CSH will be wound down, with key elements of the Code being brought into Part L instead.

The upcoming changes to Part L are expected to include a Fabric Energy Efficiency target for the first time. This is currently only required for dwellings which are built to the Code.

Although details of the consultation have not been announced yet, rumours of the Code winding down have been fuelled by the following  statement from the Building Research Establishment (BRE) and the Department for Communities and Local Government (DCLG) which reads: “Regardless of the outcome of the review process, BRE and DCLG expect there will be a need for the CSH services to be maintained for a period to manage assessments, the pipeline of existing planning permissions, funding commitments currently in place, and so on.”

We’re keeping a close eye on developments, and will let you know about any significant recommendations in the consultation.

Robust Details – Update April 2013

The Code for Sustainable Homes allows Part E Robust Details (RD’s) to be used in order to qualify for sound credits under ‘Health & Wellbeing’ (Hea2) without the need to on-site pre-completion sound testing.

New Robust DetailsTM are regularly added and available for registration, and we thought it would be useful to include these on our website as soon as we recieve them.

April 2013 has seen the addition of a new concrete separating wall detail, E-WM-26 – Besblock Star Performer block with 100mm insulated cavity and gypsum-based board. This detail is eligible for 1 CSH credits (or 3 EcoHomes credits).

The below table sets out the other Robust DetailsTM credits currently available (as of October 2012):-

RD

Robust Details – Update Jan 2013

The Code for Sustainable Homes allows Part E Robust Details (RD’s) to be used in order to qualify for sound credits under ‘Health & Wellbeing’ (Hea2) without the need to on-site pre-completion sound testing.

New Robust DetailsTM are regularly added and available for registration, and we thought it would be useful to include these on our website as soon as we recieve them.

January 2013 has seen the addition of a new concrete separating floor detail, E-FC-16 – Thermal Economics Iso-Rubber CC3 resilient layer bonded to screed applied to pre-cast planks. This detail is eligible for 3 CSH credits (or 4 EcoHomes credits).

The below table sets out the other Robust DetailsTM credits currently available (as of October 2012):-

RD